![]() Twickenham StadiumControlled Group had to prepare the structure whilst working around live events at the stadium. Much of the structure was post-tensioned concrete. To use traditional demolition methods would have been a complicated and dangerous undertaking. The nearest residents being located just 100 Metres away. < BACK TO VIDEOS ![]() |