![]() Below is a list of case studies showcasing our work. Marsham StreetAt various stages, blasting took place within 15 metres of occupied offices and residential properties, with the general public passing within 10 metres of the site. Sensitive telecommunications.. Sheffield Town HallThe project involved on-site crushing and recycling, with the recycyled concrete being transported and used elsewhere for fill material with the same client, saving a significant amount of time and.. Twickenham Rugby GroundControlled Group had to prepare for the event whilst working around live events at the stadium, and also ancillary main contractor works being carried out at the same time.Controlled Group had to.. World Trade Centre Hotel, DubaiUsing a combination of Controlled Groups specialist operatives and local labour, the planned programme was achieved. As scheduled, on the day of the blowdown, the individually placed 2,000.. Ramagundam Power Plant, IndiaThe explosives team planned and carried out the successful demolition of the structures in only 4 weeks. Using local labour and limited resources, the team showed its versatility and ability to work.. ![]() |